A personal prompt library for supply chain planners

You keep templates for every report except the prompts you type each week. Ten ready-to-copy prompts for a planner's week, and where to keep them now that GPTs and Gems are being retired.

Illustration of a 1950s shipping office desk: a revolving wooden carousel of rubber stamps, one stamp with a red handle standing beside an open ink pad, a stack of blank forms with one stamped box, a fountain pen and a wire tray, a lorry in the loading yard outside the window

How many times did you type the same request into a chatbot this month?

"Write a polite but firm email to this supplier." "Summarise these meeting notes into actions." "What changed between last week's report and this one?" Each time you phrase it a little differently, and each time the answer is a little different too.

Somewhere in your chat history is the version that worked best. It was in March, you think. You will not find it.

Planners keep templates for everything: the S&OP deck, the supplier scorecard, the weekly exception report. The one thing most of us do not keep is the prompts. This post fixes that, with ten prompts for a planner's week that you can copy today.

What a prompt library is

A prompt library is a small set of tested, reusable prompts with blanks for the parts that change. It is the AI version of a document template: the structure stays, the data changes every week.

A good reusable prompt is written for someone who knows nothing about your job. Anthropic's guide puts it well: treat the model as a brilliant but new employee, and explain why an instruction matters, not only what it is. OpenAI's advice is to put instructions first and to be specific about context, length, format and style. Google's advice for Workspace is to split complex tasks into separate prompts.

Every prompt below follows the same anatomy.

PartWhat it doesExample
RoleTells the model which hat to wear"Act as a sceptical supply chain director"
InputThe part you paste or attach each time, in [brackets]"[paste PO, item, quantity, confirmed date]"
TaskOne clear job, with the thresholds you use"Flag items where the forecast changed more than [20]%"
RulesWhat it must not do"Do not change any forecast", "Keep every number exactly as written"
OutputThe shape you need, ready to use"One table, sorted by revenue impact"
Honesty clauseMakes gaps visible instead of filled"Write 'not agreed' rather than guessing"

The honesty clause is the one most people leave out, and the one that saves you from confident nonsense.

What it means for supply chain

A shared library changes more than your own speed:

  • The same question gets the same shape of answer. Five planners using one KPI commentary prompt produce a pack that reads as one document.
  • New planners get productive faster. The library shows them what good looks like for the weekly routines.
  • Your thresholds become explicit. Writing "[20]%" into a prompt forces the team to agree on 20%.
  • Mistakes get fixed once. When a prompt invents a driver, you add a rule, and everyone gets the fix.
  • It survives a change of tool. A prompt in a text file works in any assistant your company approves next year.

That last point matters right now. The places where people stored prompts are moving.

WhereWhat you can storeSharingStatus, November 2026
Claude ProjectsInstructions plus knowledge files, per projectTeam and Enterprise plansAvailable on all plans; Free is limited to 5 projects
Claude SkillsFolders of instructions, scripts and files that load when a task needs themOwners on Team and Enterprise can give a skill to everyoneAvailable on all plans; needs code execution
ChatGPT ProjectsInstructions, files and chats per projectAll plans, with edit or chat accessAvailable
Custom GPTsInstructions and filesLinks and workspace sharingBeing retired: OpenAI's standard retirement date is 11 December 2026
Gemini GemsInstructions and knowledge filesViewer or editor rolesBecoming "skills": personal Gems are removed on 17 December 2026; Workspace business accounts follow in March 2027
Microsoft 365 CopilotSaved prompts; agents built in Agent BuilderSaved prompts can be shared to a Teams team; agents to named peopleAvailable with a Copilot licence

My advice: keep the master copy in a plain document you own, such as a shared file or a page in your team's wiki. Put copies into whichever tool you use this year. When the tool changes, the library does not.

The library: ten prompts for a planner's week

Fill in the [brackets], paste your data, and adjust the thresholds to your own. The ones that read files need an assistant that accepts attachments.

1. Monday: forecast exception review

You are a demand planner's second pair of eyes. Attached is this week's forecast export with last 13 weeks of actuals, the current forecast and the previous forecast per item.
Flag items where (a) the forecast changed more than [20]% since last week, (b) actuals were above or below the forecast for [3] weeks running, or (c) the forecast is zero but there were sales.
Return one table: item, rule triggered, the numbers, and one line on the most likely reason. Sort by revenue impact if prices are in the file, otherwise by volume. Do not change any forecast. List items you could not assess and why.

2. Monday: supplier chaser email

Write a short, polite and firm email to [supplier contact] at [supplier] about these overdue or at-risk purchase order lines: [paste PO, item, quantity, confirmed date, need date].
Say what we need (a confirmed date per line by [day, time]), why it matters (which production or customer it affects), and what we will do if we do not hear back.
Maximum 120 words. No apologies, no blame, no exclamation marks. Write it in [language]. Give me a subject line too.

3. Tuesday: meeting notes to actions

Below is the transcript or my rough notes of today's [S&OP / ops review / supplier call].
Extract: decisions taken, actions (owner, due date, one line each), open questions, and risks someone mentioned but nobody owned.
Use only what is in the notes. Where an owner or date is missing, write "not agreed" rather than guessing. End with a three-line summary I can paste into a chat channel.
[paste notes]

4. Tuesday: explain what changed

Here are two exports of the same report, from [last week] and [this week]: [attach both].
Tell me what changed, in order of size: which rows are new, which disappeared, and which values moved by more than [10]%.
For the five biggest changes, say whether the cause is visible in the data (a new order, a cancelled PO, a changed parameter) or not. Show the calculation for each. Do not speculate beyond the data.

5. Wednesday: challenge my plan

Act as a sceptical supply chain director. Here is my plan for [topic], with the assumptions I made: [paste].
Find the three assumptions that, if wrong, would hurt us most. For each: what would have to be true for it to hold, what early signal would show it is breaking, and how cheaply I could test it this month.
Be direct. Do not rewrite the plan.

6. Wednesday: data clean-up helper

I have a column of [supplier names / item descriptions / addresses] from different sources, attached.
Group the entries that refer to the same thing, propose one standard spelling per group, and give your confidence (high, medium, low) for each match. Never merge two entries with different [VAT numbers / item codes].
Return a mapping table: original value, proposed value, confidence, reason. Do not change the original file.

7. Thursday: write the formula

In [Excel / Google Sheets], column A holds [description], column B holds [description] and column C holds [description], from row 2 to about row [n].
I want column D to show [what you want, in plain words].
Give me one formula for D2 that I can drag down, explain each part in one line, and give two test rows with the result I should expect. If it needs a helper column, say so.

8. Thursday: translate for the shop floor

Rewrite this [instruction / planning change / safety note] so a warehouse or production team can act on it at the start of a shift: [paste].
Use short sentences and plain words, no abbreviations except [list]. Keep every number, date and quantity exactly as written.
Put the action in the first line. Then produce a version in [second language] with the same meaning.

9. Friday: KPI commentary

Here are this month's supply chain KPIs with target, last month and the same month last year: [paste table].
Write the commentary for the monthly pack: one sentence per KPI on what moved and the main driver, then three lines on what needs management attention.
Only name a driver if it appears in the data or in these notes: [paste notes]. Otherwise write "driver unclear". No adjectives like strong or disappointing; use the numbers.

10. Friday: my week in five lines

Here are my notes, sent emails and to-do list from this week: [paste].
Write a five-line update for my manager: what I finished, what moved forward, what is blocked and by whom, one decision I need from them, and my top priority for next week.
Plain words, no filler, no more than 90 words.

Pick the three you would use most, run each on real work this week, and fix what goes wrong by adding a rule. A prompt becomes part of the library only after it has worked three times.

What it can't do, and the traps

  • A prompt is not a process. If nobody agrees what a forecast exception is, a prompt will not settle it. Write the rule down first.
  • Watch what you paste. Supplier prices, customer names and contracts belong only in an assistant your company has approved for that data.
  • Models change under your prompts. A prompt that worked in June can behave differently after a model update. Re-test your top five every quarter.
  • Long prompts are not better prompts. If a prompt grows beyond a page, split it in two, as Google's guide suggests.
  • Tools come and go. GPTs and Gems are being retired within months of each other. Keep the text where you control it.

Save the prompt you typed twice

The next time you notice you are typing a request for the second time, stop. Copy the better version into a document called "Prompt library", add the brackets, and write one rule that would have made the first answer better.

The planners who get the most from AI are not the ones with the cleverest prompts. They are the ones who never write the same prompt twice.

Which prompt would you add as number eleven?

Sources

Illustration of a scale model of a small company on a workbench: two factories and a warehouse linked by roads with miniature lorries, beside a pair of callipers, a pencil and an open notebook

Read it, then try it

The posts on this blog are meant to be used, not only read. Each one ends in something to do: a prompt to run, a calculation to rebuild or a first step for this week. You learn what AI can do in supply chain by putting it to work on a real problem.

Meet Upshift

Most examples use Upshift, a fictional bicycle maker. It builds road and gravel bikes, each as a regular and an e-bike version, in two plants, and serves dealers and retail chains through five distribution hubs. Upshift isn’t a real company, and none of its data comes from one. Meet the company.

The dataset and the exercises

Behind Upshift sits a complete synthetic company dataset: products, suppliers, dealers, orders, stock, production and the transport network, all consistent with each other. Its dates follow a date you choose, so the data always looks current. The exercises on this site use the same company, each with a task, the files you need and a way to check your result.

A post keeps its example small enough to paste into a chat. The dataset and the exercises let you do the same work at the scale of a real company.

The dataset and the exercises are free with an account. The app is in early access for now: request an account from the sign-in screen and I’ll send you an invitation as soon as I can.

Pass it on

Know a colleague who should read this? Post it where they will see it, or send it to them directly.

More posts

Illustration of a long water pipe along a factory brick wall: a bucket and mop stand under the dripping tap at the far right, while the real leak is a crack spraying yellow water at a joint far upstream on the left, with a step ladder and pipe wrench beneath it

Noël Vranckx •

AI for root-cause analysis of late deliveries

Most late-delivery reports blame the carrier because that is the first box in the drop-down. An AI model that reads the dates and the notes together tells a different story, and you can test it in ten minutes.